c_manual:c13
Differences
This shows you the differences between two versions of the page.
c_manual:c13 [09/12/2024 16:12] – created Kevin Kirk | c_manual:c13 [Unknown date] (current) – external edit (Unknown date) 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | {{ : | ||
+ | |||
+ | =====C-13 Technical Rescue Operations - Structural Collapse====== | ||
+ | ===Emergency Manual=== | ||
+ | ==Date Revised: 09/ | ||
+ | < | ||
+ | |||
+ | [[https:// | ||
+ | [[https:// | ||
+ | |||
+ | ---- | ||
+ | |||
+ | **Policy/ | ||
+ | |||
+ | **PURPOSE** | ||
+ | |||
+ | The purpose of this procedure is to establish guidelines for the response of fire department personnel and equipment to structural collapse incidents. Structural collapse operations present a significant danger to fire department personnel; the safe and effective management of these operations require special considerations. This guideline identifies some of the critical issues which must be included in managing these incidents. | ||
+ | |||
+ | **TACTICAL CONSIDERATIONS** | ||
+ | |||
+ | Structural collapse incidents could present the incident commander and rescue teams with multiple issues, including but not limited to; limited victim information, | ||
+ | |||
+ | Due to the inherent dangers associated with these operations, Toledo Fire and Rescue’s Risk Management Profile shall be applied to all structural collapse operations and shall be continuously re-assessed throughout the incident. A phased approach to structural collapse operations which include; **Arrival**, | ||
+ | |||
+ | **UNDER NO CIRCUMSTANCE SHALL ANY PERSONNEL OTHER THAN THE ON-DUTY RESPONDING TECHNICAL RESCUE COMPANIES ENTER THE STRUCTURAL COLLAPSE.** | ||
+ | |||
+ | **1.** Establish command and provide an initial size-up. | ||
+ | |||
+ | **2.** Request the response of the Technical Rescue Team through Fire Dispatch. | ||
+ | |||
+ | **3.** Establish collapse zones, minimum of 1.5 times the structures height. | ||
+ | |||
+ | **4.** Conduct air monitoring of the area. **Request all utilities to respond through Fire Dispatch.** Consider the air monitoring of adjacent structures. | ||
+ | |||
+ | **5.** Establish separate staging areas for emergency apparatus and for EMS transport units. | ||
+ | |||
+ | **6.** Perform triage for all self-extricated victims. | ||
+ | | ||
+ | **7.** Attempt to obtain the number of victims and their possible location within the structure. | ||
+ | |||
+ | **8.** Consider the evacuation of adjacent structures. | ||
+ | |||
+ | **9.** Non-entry methods of rescue may be considered, such as lowering a portable ladder, utilizing a pike pole to pull a victim, or by means of extending a rope to a victim. In complete collapse incidents first responders may consider surface rescue/ | ||
+ | |||
+ | **10.** Assist the Technical Rescue Team with the staging of equipment as directed. | ||
+ | |||
+ | ---- | ||
+ | //First arriving Technical Rescue Unit that is staffed with a Technical Rescue Qualified Team Leader should be assigned Rescue Sector.// | ||
+ | |||
+ | //**Rescue Sector responsibilities include: | ||
+ | |||
+ | • Assuming technical rescue operations control. | ||
+ | |||
+ | • Identifying hazards and critical factors. | ||
+ | |||
+ | • Developing a rescue plan and back-up plan. | ||
+ | |||
+ | • Communicating with and directing resources assigned to Rescue Sector. | ||
+ | |||
+ | • Informing Command of conditions, actions, and needs during all phases of the rescue operation. | ||
+ | |||
+ | **Technical Rescue Team personnel refer to Standard Operating Guidelines for Structural Collapse.** | ||
+ | |||
+ | \\ | ||
+ | |||
+ | ---- | ||
+ | See Also: | ||
+ | ---- | ||
+ | |||
+ | <- c_manual: | ||
+ | |||
+ | |||